Electric power utility map6/4/2023 ![]() ![]() Hosting Capacity computed with EDD software. Please seek appropriate technical, operational, financial, and legal advice before proceeding. Pepco Holdings, Atlantic City Electric, Delmarva Power, Pepco, and their affiliates cannot guaranty the accuracy of the information found on this map. The technological, legal, and regulatory considerations that apply to interconnection of solar generation and other distributed energy resources are complex and constantly evolving. Type an address into the search box to locate a specific location. A photovoltaic system should not cause inadvertent network protector operations and may require additional monitoring or controls, such as reverse power relays to insure proper network protector operations.Ĭlick here to access a searchable version of the Hosting Capacity map for underground network distribution feeders. Spot network customers who want to apply for a Level 2 application must only be serving one customer, and the system must be limited to less than five percent of the spot network peak load or 50 kW, whichever is less.Ĭustomers on an area grid network applying for a Level 3 system cannot be greater than 50 kW, with no single-phase system larger than 20 kW, and the aggregate maximum injection is five percent of the peak load or 50 kW whichever is less.Īpplications (Level 4) for systems larger than Level 2 or 3, on either a spot network or an area grid network will be reviewed by our engineering team. Please note NJ state rules and levels may be different (see “Criteria Summary”). Customers applying for a Level 1 application cannot be sized above 10 kW and must be inverter based. Any system over 250 kW is considered to be "large." After the aggregate large limit is reached, 250 kW or smaller systems can continue to be added until another circuit or substation violation would be reached.Ĭlick here to access a searchable version of the Hosting Capacity map for radial distribution feeders. Please note that the aggregate limit of large distributed energy resources is 3 MW on 12/13 kV, 6 MW on 25 kV, and 10 MW on 34 kV. Expand all Overview & general Coal Electricity & nuclear Oil and natural gas Renewable Top U.S. Energy Atlas, our new interface for web map applications and geospatial data catalogue. Results shown may understate the hosting capacity and results will be revisited in the future.ĭue to the amount of data, the map may take a minute to load. Energy Information Administration (EIA) Maps Skip to page content Visit EIA's U.S. Hosting capacity is not an exact science. All applications for interconnection will still require a full review and may also require additional interconnection costs. Although the values are meant to provide the user with a general idea of availability, space on the desired feeder is not guaranteed and/or may change at any time. ![]() The Hosting Capacity map gives an indication of how much generation (expressed in kW) can be added to a feeder before the feeder reaches capacity or other limitations that reduce the reliability of service to electric customers on the feeder. We support renewable energy and partner with our customers to ensure safe and reliable interconnection of renewable energy and other distributed energy resources into the electric grid. ![]()
0 Comments
Leave a Reply. |